ACACIA

Requests of Expressions of Interest from Qualifying Parties Wanting to Participate in the Provision of Civil Works for the Upgrade of Plant Return Water Pond for Bulyanhulu Mine

WhatsApp
Twitter
Email
LinkedIn
Instagram

BARRICK

BULYANHULU GOLD MINE LIMITED

Requests the submission of Expressions of Interest from qualifying parties wanting to participate in the provision of Civil Works for the Upgrade of Plant Return Water Pond for Bulyanhulu Mine

Bulyanhulu Gold Mine Limited (BGML) is a fully owned subsidiary of Barrick Gold Corporation. Bulyanhulu Gold Mine Site is located 45km south of Lake Victoria. in the Kahama District of Shinyanga Region, northern Tanzania. There are road accesses to the mine from Mwanza, 127km to the northeast and from the town of Kahama, 84km to the south.

Bulyanhulu Gold Mine Limited intends to Contract 8 health and competent civil/building contractor for an Upgrade to the existing plant return water pond within the mine site Area. The upgrade shall be done as per recommendation stipulated to the mine by the National Environmental Management Council, NEMC. The project is aiming at minimizing the contamination of hazardous elements from storm water, runoff water to the natural soil hence soil pollution.

BGML. therefore, invites “Expressions of Interest” from reputable, experienced and certified companies interested in pre-qualifying for inclusion in a tender process for the provision of:

·         Civil Works for Upgrade of Plant Return Water Pond;

·         The project shall involve clearance works, setting out works, earth works. piping works & concrete works as per detailed drawings and project specifications;

The contract is intended to be awarded through a competitive tendering process in which a restricted number of suitable qualified and experienced contractors shall be invited to receive the tender documents. If your company would like to be considered for pre-qualification to receive the invitation to tender, please submit an “Expression of Interest” on your company’s letterhead together with the following additional information and/or documentation:

·         Full company profile that includes plants, equipment, organization structure as well as curriculum vitae;

·         Company registration documents i.e. Certificate of incorporation, business licence, TIN, VRN, 2019 Tax Clearance Certificate etc.;

·         Submission of CRB documentation showing registration as a Tanzanian Civil/Building Contractor at least Class 2;

·         Occupational Health and Safety Authority (OSHA) compliance certificate;

·         Must be registered with the Tanzanian Worker’s Compensation Fund and NSSF as an Employer (Send Certificate of Registration & Compliance Clearance Certificate)

·         With regard to the mentioned Civil Works for Upgrade of Plant Return Water Pond, submission of documentation to show:

·         A Detailed proven previous experience and client reference for similar works in Civil Works for an Upgrade of Return

·         Water Ponds similar to that of BGML;

·         An exemplary Safety record working in similar environment to those encountered at Bulyanhulu Mine;

·         An established pool of key personnel familiar with project management techniques;

·         Safety policy for the company, Environmental policy for the company and Quality control and assurance policy for the company

·         Contractor to allow and submit ownership documents. specifications for the following critical equipment. required to carry out projects works;

1 No crane (Not less than 30 Tonnes lifting capacrty1 No certified “banana shaped” concrete bucket  (1 – 1.5 m3 volume capacity)
4 Sets of Certified Lifting Slings (4 Tonnes capacity each) 1 No Back hoe machine.
1 m3 concrete mixer.4 Tonnes concrete dumper.
2 Nos Dump Truck (15m3 Capacity each)  

An extensive track record with regard to Corporate Social Responsibility Programme and an evidence of utilising and developing skills of the local community surrounding your previous projects.

Kindly send your response by email to [email protected] by latest close of business on the 27th  October 2019. Any responses received after this date shall not be considered. Please quote reference number “Bul-Requisition Number: SR010875 in the subject line of your email.

Pre-qualification of any company submitting an ‘Expression of Interest” shall be at the sole discretion of BGML.

For and on behalf of BULYANHULU GOLD MINE LIMITED