PDiamonds

CONTRACTORS FOR SUPPLY AND DELIVERY OF SLOPE STABILITY RADAR

WhatsApp
Twitter
Email
LinkedIn
Instagram

1.INTRODUCTION

Williamson Diamond Limited is a diamond mine 23 kilometers (14 miles) northeast of Shinyanga in Tanzania; it is known as the first significant Diamond mine outside of South Africa and was established in 1940 by Dr. John Williamson, a Canadian geologist. The mine is an open pit operation based upon the 146 hectare Mwadui kimberlite pipe, which is the words largest economic kimberlite to have seen continuous mining. Petra Diamonds Limited (Petra) Acquired Its 75% Stake in Williamson in February 2009 and has shared ownership with the Government of Tanzania (which has a 25% holding) since this time.

The company is in the process of procuring Slope Stability Rader machine therefore, inviting interested eligible service provides to submit Experience of interest.

The purpose of EOI/RH is to explore the supply market for competent Supplier with the requisite technical skills and knowledge and financial capacity to undertake the supply and delivery of slope stability radar machine.

The responses to this EOI/RH will be used to shortlist capable services provides that will be invited to respond the main tender for the provision of slope stability radar machine for Williamson Diamond Limited. The details and dates for the issue of the main tender will be communicated to the shortlisted companies. It is necessary to respond to this EOI/RH in order to be prequalified to be considered for the main tender.

Scope of work

Due to safety reasons for both workers and machines Williamson Diamond Limited is required to have pit slope monitoring equipment as mining operation is continuing going deeper and deeper.

Physical properties 
Temperature range-30^0c to +55^0C
Vertical range  86^0 full envelop (+49^0 from horizontal plane   (-37^0 from horizontal plane)
Horizontal range175^0 full envelope (-+87.5^0 from the centre)
Maximum range1200m
Weight1350kg
NETWORK REQUIREMENTS 
Minimum Network speed 10Mbit/s  (Normal monitoring)
Wi-Fi communications802.11b compatible
Hard drive size on radarMinimum 500GByte

1.INFORMATION REQUERED

PRE-QUALIFICATION REQUIREMENTS          
COMMERCIAL20%
Company profile2.5%
Copy of registration/ Incorporation Certificate2.5%
Copy of Valid Tax Clearance certificate (TCC)2.5%
Copy of TIN Certificate of Firm /company and VRN2.5%
Copy of Current Business Permit/Trade license2.5%
Company shareholding structure2.5%
List of Directors2.5%
Compliance with the Mining (Local content) Regulations,2018 by having Local content Plan-Approved by mining commission and details of capacity of the contractor to hire local resources and procure local goods2.5%
FINANCIAL POSITION & TERMS OF TRADE 20%
Audited & certified financial statements (20218-2020)10%
At least 2 reference from the applicants banker regarding supplier’s credit position10%
SAFETY AND ENVIRONMENTAL MANAGEMENT SYSTEMS20%
OSHA Compliance certificate  5%
Environmental Compliance Certificate5%
 Safety and Environmental policy5%
ISO Standard Compliance5%
TECHNICAL SCOPE AND PAST EXPERIENCE40%
At least 3 names of the applicants clients ,value and duration of the slope stability Radar machine supply contracts emerged with the past three years (must be listed)10%
signed contract /LPOs (proof of the above)10%
Acceptable certificates /completion certificates (proof of the above)10%
Provide at least 3 recommendation letters from different clients5%
Provide the Names of slope stability Radar Machine OEM to be utilized by the applicant5%

Interested Companies/Respondents must submit their Expression Letter of INTEREST (LOI) by quoting the NAME of the service they intend to express interest on together with supporting information to WILLIAMSON DIAMONDS LIMITED which states the full name, address, telephone and e-mail address of the interested Company, name of the principle contact and signed by an authorized representative. All LOIs and supporting documentation must be received by WDL office via e-mail [email protected]

The closing date for the submission of EOI/RFI Document from interested companies is 25th October 2021 at 12000 hours

WhatsApp
Twitter
Email
LinkedIn
Instagram

Related